Technical Data
Services
- Technical assistance
- Contractual assistance
- Financial control
- Technical control
Client
- SITRAD
Tons/Year
240,000Date
Finished at: 2009
Waste to energy plant of Liège - SITRAD
| published on December 6, 2011 |
From 1988 to 1992, IBH completed technical and financial control for the modification of the existing Intradel Centre.
The assignment consisted of the addition of three Refuse Derived Fuel (RDF) incineration units with energy recovery and advanced flue gas cleaning in order to guarantee a throughput of 240.000 tons/year. IBH supervised the site preparation and leachate collection for a new sanitary landfill.
From 1992 to 1996, IBH provided technical and financial control for additional facilities to the Intradel plant. The project included the installation of a fourth Refuse Derived Fuel (RDF) incineration stream, biogas collection and complementary leachate treatment for the existing landfill.
From 1990 to 2009, IBH assisted the client, both technical and contractual, concerning the operation monitoring of the municipal waste sorting and incineration plant.
