www.ibh.be | Printed version
contact : Chaussée de Louvain, 592 - B-1380 Lasne
Tel. : 32/2/357.07.57 - Fax : 32/2/357.07.50 - E-mail : ibh@ibh.be
Date: 06.10.2009
IBH s.a. (Limited)is a belgian private company of consulting engineers mainly involved in environmental projects and solid waste management.
IBH Engineering office Bourgeois et Harris s.a. | Contact
Comparative study of solid waste management solutions, including technical, economical, environmental aspects, in order to replace an existing incineration line by a combination of different processes : sorting, biomethanisation, biodrying, incineration.
Feasibility study of a materials recycling facility aiming at the valorisation of paper, cardboard, plastics and metals after separate collection (30,000 t/y).
Feasibility study of sorting and shredding plant for municipal bulky waste, comparison of alternative locations including transportation criteria and economical aspects.
Feasibility study of Herstal Plant refurbishment (320.000, t/y) aiming at transforming existing waste sorting / incineration units into a mass burning plant : technical, economical and environmental aspects.
Review of existing situation of municipal and commercial waste collection in Occidental Hainaut Province (23 communes and 320,000 inhabitants).
Feasibility study of the implementation of a common collection service, preparation of tender documentation and evaluation of tenders.
Feasibility study of a transfer station for municipal waste, technical and economic comparison of transport by road and by river (120,000 tons/year).
Technical and financial evaluation of different municipal waste treatment schemes as alternative solutions to an incineration plant for the Namur Province, preliminary design of sorting, composting and RDF combustion plants.
Environmental impact assessment of considered solutions and legal aspects of new scheme implementation.
Assistance to the client for the comparison of alternative solutions for municipal waste treatment in Brussels
Feasibility study for the construction of an incineration plant for household refuse (capacity : 150,000 t/y) with recovery of energy.
Feasibility study for the construction of transfer stations in the Liège area.
Feasibility study for the construction of transfer stations in the Brussels area, comparison of alternative locations and economic assessment with search of optimum solution.
Participation in a feasibility study for the construction of a waste to energy plant in Bucarest with a throughput of 330.000 t/y : technical and economical aspects for the process equipment.
Feasibility studies concerning envisaged MSW waste to energy plants to be implemented in Castellon Province , Alicante Province and Valencia Province:
General study of solid waste co-incineration in cement production factories :
Detailed feasibility study of a pilot plant for the treatment of urban solid wastes in the Bangkok area.
Feasibility study for the treatment of municipal refuse by composting or incineration.
IBH s.a. copyright © 1999-2009 All rights reserved. Powered by Nikita Concept